Voir le texte source
De WikiCinéjeu.
pour
Tile Over Tile Radiant Heated Bathroom Floor ArmstrongBennetsen
Aller à :
Navigation
,
rechercher
Tile over tile means just what it says, in this case youre planning to sandwich a layer of radiant heat mats between the old and the newest tile. Tile over tile is definitely an simple way to avoid the mess related to getting up the old bathroom floor, but requires thorough planning. Deflection: Before you install a radiant heat mat over the old bathroom tile and install new tile over the mat, you must check always the-floor for deflection. This is actually the maximum amount a floor can go underneath the anticipated load (you). Ceramic tile is difficult and can break o-r dislodge when the surface bends underneath the weight. Heres an easy test: Stand in the middle of the bath-room floor and leap up and down. If the floor moves it has a deflection issue and is not a good choice for tile over tile installation until you reinforce the sub-floor. [http://amazingrenovationsinc.com/roofing.html go there] [http://amazingrenovationsinc.com/outdoor/kitchens.html my outdoor kitchen houston] Prevent That Going Feeling: Because youre tiling over hardwood, you must plan in advance to prevent making the toilet, counter and bathtub look like theyre sinking into the new ground. [http://amazingrenovationsinc.com/outdoor/pergola.html click for pergolas houston] Fortunately, lots of the new sparkling warming mats are no thicker than the level of the mortar you'd usually apply for many tile installations. Mix this with the utmost height above the old floor and a hardwood thickness of inch could be only inch. One method to keep the bathroom fixtures from looking swallowed up by the new ground is to remove and reinstall the baseboard. In addition to this, you will want to buy new baseboard hardwood to check the new floor? The level of-the new floor will also require you to change the length of the door( s) and perhaps install a new ceiling. Preparation: Remove or re-attach broken tile pieces. Wait until the ground is sanded and carefully vacuumed before you fill the spaces with mortar, if you take them off. If some of the tiles have inspections larger than 1/8, you should look at a break isolation membrane. This membrane can be a roll-on product that you apply to the old tile. The new floor is allowed by the membrane to move independently of the old. Next, sand the old hardwood and so the mortar features a good bonding surface. A belt sander would ensure a consistent bonding area. Please be sure you use a breathing apparatus and safety glasses while sanding. The tiles might have been dismissed with toxic lead glaze. After sanding, machine the tile and wipe down with an all purpose cleaner. Pay special attention to the areas untouched by the sander. Installation: Roll-out the mats pre-fabricated for your specifications by the producer. Some warm methods, like Quickmat, are self-adhesive and need no mortar to secure them for the old tile floor. Keep a board and some scrap 2 x 4s practical to safeguard the mats once the bathroom is being used, if youre re-tiling the only bathroom. Throughout the installation process, use a electronic ohm meter to test the weight of the heat mats. This can enable you to monitor the pads for short circuits. [http://amazingrenovationsinc.com/kitchen-renovations/renovations.html click here] Have your electrician connect the heating mats to-the power source and install the thermostat. Depending on the local electrical assessment processes, you may need to wait until the job is examined before you start laying tile. Trowel out the mortar on the pads. Some manufacturers recommend latex- altered o-r epoxy-modified mortar and grout instead of water-based multi-purpose adhesives. Mortar beds thicker than 3/8 inch should work fine for some systems; they simply take somewhat longer to heat up. Make certain the mortar used over open areas, (underneath the toilet) is level with the mortar lined mats, since you wont be covering the entire floor with warming mats. Dont beat the trowel around the mat or heating wire to eliminate excess mortar in the trowel. This might sever the heating wire. At this time, you'd lay the tile. If you have no knowledge tiling, practice in your neighbors bathroom floor. Fire It Up! Your radiant hot bath-room ground appears wonderful and you cant wait to get hot feet. Just do it, but limited to 10 minutes. Dont put the device in to full operation before mortar is entirely healed. This can take as much as a month. See why extensive planning is indeed important?
Revenir à la page
Tile Over Tile Radiant Heated Bathroom Floor ArmstrongBennetsen
.
Affichages
Page
Discussion
Voir le texte source
Historique
Outils personnels
Créer un compte ou se connecter
Navigation
Accueil
Cinéjeu
Forum
Modifications récentes
Page au hasard
Aide
Rechercher
Boîte à outils
Pages liées
Suivi des pages liées
Pages spéciales